{"version":"1.0","type":"rich","provider_name":"Acast","provider_url":"https://acast.com","height":250,"width":700,"html":"<iframe src=\"https://embed.acast.com/$/67c5d757b48a8f157c1f9076/6b044a692e1921ea66d76682?\" frameBorder=\"0\" width=\"700\" height=\"250\"></iframe>","title":"Construction Begins on Long-Awaited Kells Walk and Cycleway ","thumbnail_width":200,"thumbnail_height":200,"thumbnail_url":"https://open-images.acast.com/shows/67c5d757b48a8f157c1f9076/1795443301812-71cf410c-c174-4ec3-8356-df733fc3b428.jpeg?height=200","description":"<p>Construction is now underway on a long-awaited walk and cycleway in Kells, connecting Gardenrath Road with the school campus on Jim Brunnock Road.</p><p>The project has been called for over several decades and is expected to provide a safer route for children and families travelling to and from local schools, while also helping to reduce traffic congestion at peak times.</p><p>Cathaoirleach of Meath County Council, Councillor Sarah Reilly, says she is delighted to see work finally getting underway, having made the project a priority during her year in the role.</p><p>She says she is determined to see the project completed before her term as Cathaoirleach comes to an end, and believes it will make a real difference to families living in the south-west of Kells</p>","author_name":"lmfm "}