{"version":"1.0","type":"rich","provider_name":"Acast","provider_url":"https://acast.com","height":250,"width":700,"html":"<iframe src=\"https://embed.acast.com/$/67c5d757b48a8f157c1f9076/6aa14a199d5ca4f665d2a2b5?\" frameBorder=\"0\" width=\"700\" height=\"250\"></iframe>","title":"Minister Thomas Byrne seeks firm assurances from ESB Networks following repeated East Meath Power Outages","thumbnail_width":200,"thumbnail_height":200,"thumbnail_url":"https://open-images.acast.com/shows/67c5d757b48a8f157c1f9076/1788955141328-f3bd99ca-7ee3-46a8-bf06-20996f85d6ea.jpeg?height=200","description":"<p>Local TD and Minister, Thomas Byrne has sought firm assurances from ESB Networks that its programme of improvement works serving Bettystown, Laytown and Mornington will be completed within the promised timeframe and with the minimum possible further disruption to customers.</p><p>&nbsp;</p><p>ESB Networks has confirmed that the area experienced six unplanned outages during 2026, affecting all or a significant portion of the three communities.&nbsp;</p><p><br></p><p>It has attributed the outages to several separate faults across the local network and indicated that major capacity and continuity works, including projects at Julianstown, are expected to be completed by the end of September.</p><p><br></p><p><br></p>","author_name":"lmfm "}