{"version":"1.0","type":"rich","provider_name":"Acast","provider_url":"https://acast.com","height":250,"width":700,"html":"<iframe src=\"https://embed.acast.com/$/663884554e48ad001264210a/6a5c84c8f782764c4ce79743?\" frameBorder=\"0\" width=\"700\" height=\"250\"></iframe>","title":"Sign Your Name to It — Commissioning and Handover of Cold Water Systems | Unit 310 Phase 3","thumbnail_width":200,"thumbnail_height":200,"thumbnail_url":"https://open-images.acast.com/shows/663884554e48ad001264210a/1784448085489-427bf820-0af3-4087-acec-944b70dfa18b.jpeg?height=200","description":"<p>The Copper Connection Podcast – Season 2, Episode 79, Sign Your Name to It — Commissioning and Handover of Cold Water Systems | Unit 310 Phase 3.</p><p><br></p><p>There's a moment at the end of every job where the customer looks at you, not the boiler — because they're about to trust something you built. That's what commissioning is really about.</p><p><br></p><p>In this episode, host Chris Bailey covers Unit 310 of the 9289 City &amp; Guilds Level 3 Diploma in Plumbing and Domestic Heating — Phase 3, Session 1: commissioning and handover of cold water systems, steps 2 through 5.</p><p><br></p><p>Chris covers:</p><p>✅ The full 11-step commissioning procedure, in order, and why the sequence matters</p><p>✅ The visual inspection checklist — open ends, connections, supports, valves, cisterns, FOVs</p><p>✅ Marking and labelling pipework — and the Category 5 water rule for rainwater harvesting and greywater reuse</p><p>✅ Filling and venting at normal operating pressure</p><p>✅ The soundness test explained in full — Water Regulations 1.5 × MOP, WRAS G12.2 and R12.2</p><p>✅ The BS EN 806 calculation cleared up: MDP = 1.5 × MOP, test pressure = 1.1 × MDP = 1.65 × MOP</p><p>✅ The full metallic pipe test procedure — 90 minutes total, zero pressure drop allowed</p><p>✅ Test A and Test B for plastic pipework — the exact figures you need</p><p>✅ Full Worksheet 1 walkthrough with the worked pressure calculation</p><p><br></p><p>This episode is essential listening for:</p><p>— Plumbing apprentices on the ST0303 Level 3 standard working through Phase 3</p><p>— T-Level Building Services Engineering learners</p><p>— Anyone preparing for the 9289 Phase 3 practical assessment and portfolio evidence</p><p>🔗 Handouts, worksheets and revision resources at thecopperconnectionpodcast.co.uk</p><p><br></p><p>Next episode: Unit 310 Phase 3 Session 2 — Flushing, disinfection, operational checks, documentation and handover.</p><p><br></p><p>commissioning cold water systems, BS EN 806 explained, soundness test water regulations, WRAS guidance testing, plastic pipe test A test B, unit 310 9289, plumbing apprentice phase 3, city and guilds level 3 plumbing, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast, rainwater harvesting category 5 water</p>","author_name":"Chris Bailey | Building Services Engineering Tutor"}