{"version":"1.0","type":"rich","provider_name":"Acast","provider_url":"https://acast.com","height":250,"width":700,"html":"<iframe src=\"https://embed.acast.com/$/663884554e48ad001264210a/6a5c842f78e0412bc6a48620?\" frameBorder=\"0\" width=\"700\" height=\"250\"></iframe>","title":"Fill It, Test It, Flush It — Soundness Testing Central Heating Systems the Right Way | Unit 309 Phase 3","thumbnail_width":200,"thumbnail_height":200,"thumbnail_url":"https://open-images.acast.com/shows/663884554e48ad001264210a/1784447930078-0e04727b-c76a-49e4-86ee-8459884d6167.jpeg?height=200","description":"<p>he Copper Connection Podcast – Season 2, Episode 78, Fill It, Test It, Flush It — Soundness Testing Central Heating Systems the Right Way | Unit 309 Phase 3</p><p><br></p><p>Ever watched a customer's face when the pressure gauge holds steady after a two-hour soundness test? That's the moment the job goes from \"nearly finished\" to \"properly done.\"</p><p>In this episode, host Chris Bailey covers Unit 309 of the 9289 City &amp; Guilds Level 3 Diploma in Plumbing and Domestic Heating Phase 3, Session 1: filling, venting, soundness testing, flushing, and chemically treating central heating systems.</p><p><br></p><p>Chris covers:</p><p>✅ The seven information sources you need before touching a system — Water Regs 1999, Building Regs Part G and L, BS EN 806, BS 8558, BS EN 12828, BS EN 14336</p><p>✅ Notifying the relevant person and the pre-fill visual inspection</p><p>✅ Staged filling, bleeding technique, and why overfilling triggers the pressure relief valve</p><p>✅ The BS EN 14336 soundness test standard — 30% above working pressure, minimum two hours</p><p>✅ The full 8-step preparation procedure and hydraulic testing method</p><p>✅ Cold flush, hot flush and power flush — what each one does and when to use it</p><p>✅ System additives: cleanser, descaler and inhibitor — dosing, application, and why magnetite sludge is the number one cause of premature boiler failure</p><p>✅ Full Worksheet 1 answers, including the filling loop procedure and sludge impact question</p><p>This episode is essential listening for:</p><p>— Plumbing apprentices on the ST0303 Level 3 standard working through Phase 3</p><p>— T-Level Building Services Engineering learners</p><p>— Anyone preparing for the 9289 Phase 3 practical assessment or portfolio work</p><p><br></p><p>🔗 Handouts, worksheets and revision resources at thecopperconnectionpodcast.co.uk</p><p><br></p><p>Next episode: Unit 310 Phase 3 — Commissioning and handover of central heating systems.</p><p><br></p><p>soundness testing central heating, BS EN 14336, central heating inhibitor, power flush explained, cold flush hot flush, magnetite sludge boiler, unit 309 9289, plumbing apprentice phase 3, city and guilds level 3 plumbing, ST0303 apprenticeship, T-Level building services engineering, copper connection podcast, Chris Bailey plumbing podcast, Fernox Sentinel inhibitor dosing</p>","author_name":"Chris Bailey | Building Services Engineering Tutor"}