{"version":"1.0","type":"rich","provider_name":"Acast","provider_url":"https://acast.com","height":250,"width":700,"html":"<iframe src=\"https://embed.acast.com/$/663884554e48ad001264210a/6a40cf39a3fa978237fab625?\" frameBorder=\"0\" width=\"700\" height=\"250\"></iframe>","title":"Phase 2 Master systems, science and installation best practice with building services engineering revision for construction students","thumbnail_width":200,"thumbnail_height":200,"thumbnail_url":"https://open-images.acast.com/shows/663884554e48ad001264210a/1782632066101-22bc059c-f42a-4839-bb67-e8a34e5f2880.jpeg?height=200","description":"<p>The Copper Connection Podcast – Season 2, Episode 73, Phase 2 Master systems, science and installation best practice with building services engineering revision for construction students</p><p>Phase 2 is where the 9289 gets serious. This is the phase where you stop learning about systems and start actually installing them and the assessments reflect that. With 50 exam questions, a practical assignment of up to 19 hours, and an ongoing work log to maintain, Phase 2 is the most demanding phase of the core qualification around building services engineering.</p><p>But it's also where things start to click.</p><p><br></p><p>In Episode 3 of The Copper Connection Podcast, host Chris Bailey walks you through every unit assessed in Phase 2 — breaking down the content, the exam weighting, and the key points you absolutely need to know going in.</p><p><br></p><p>Chris covers:</p><p>✅ The Phase 2 assessments — 9289-021 MCQ (75 minutes, 50 questions) and 9289-022 practical (14–19 hours)</p><p>✅ Unit 303 Scientific Principles Phase 2 — Boyle's Law, Charles' Law, latent and sensible heat, heat transfer, force and pressure, and the basics of electricity</p><p>✅ Unit 307 in full — the unit that accounts for 86% of the Phase 2 exam:</p><p>→ Cold water installation: fluid categories, backflow prevention, storage cisterns, Legionella</p><p>→ Hot water installation: vented and unvented systems, the four safety devices you must know</p><p>→ Central heating installation: open-vented vs sealed, pump positioning, zoning, controls, and Building Regs Part L</p><p>→ Sanitary appliances and pipework: trap seal loss, above-ground drainage, accessible design</p><p>→ Rainwater systems: gutters, downpipes, expansion, and sizing</p><p>✅ Unit 308 — decommissioning cold water, hot water, and sanitary systems</p><p>✅ Unit 309 — soundness testing for Phase 2 systems</p><p>✅ What the Phase 2 practical assignment actually tests — and how to prepare</p><p>✅ How to build meaningful portfolio evidence for Unit 317 while on site</p><p><br></p><p>Whether you're about to sit your Phase 2 assessments or you're working through the content now, this episode gives you the roadmap.</p><p>🔗 Show notes, revision resources, and study materials at <a href=\"http://thecopperconnectionpodcast.co.uk\" rel=\"noopener noreferrer\" target=\"_blank\">thecopperconnectionpodcast.co.uk</a></p><p><br></p><p><br></p><ul><li><strong>building services engineering</strong></li><li><strong>9289 phase 2</strong></li><li><strong>plumbing apprentices</strong></li><li><strong>9289 domestic plumbing and heating</strong></li><li><strong>cold water systems in plumbing</strong></li><li><strong>cold water systems</strong></li><li><strong>plumbing revision podcast</strong></li><li><strong>uk construction theory</strong></li><li><strong>sanitation and drainage exam prep</strong></li><li><strong>plumbing study resources</strong></li><li><strong>level 2 construction qualifications</strong></li><li><strong>masterclass in construction theory</strong></li><li><strong>bse systems</strong></li><li><strong>cold water systems training</strong></li><li><strong>podcast for construction students</strong></li></ul>","author_name":"Chris Bailey | Building Services Engineering Tutor"}